Press Release

Balfour Beatty selected as Construction Manager for Terminal Expansion Project by Jacksonville Aviation Authority

19 June 2019

US

The Jacksonville Aviation Authority (JAA) has awarded Balfour Beatty its terminal expansion project at Jacksonville International Airport (JIA). To meet the airport’s surge in passenger traffic, including a 16 percent increase in 2018, the project includes construction of the new Concourse B that will add six gates.

In addition to adding six new gates with the construction of Concourse B, Balfour Beatty will coordinate with JAA and the design team Jacobs/RS&H during the preconstruction phase to also finalise plans for secondary areas of terminal expansion. Secondary areas of expansion could include concessions, airfield circulation and apron expansion, a third level for additional concessions and lounge space, administrative and operational areas, baggage system expansion, among other work.

Scott Skidelsky, Balfour Beatty’s president of buildings operations in Florida said: “Our selection for this great project is a tribute to our aviation industry expertise and strong 19-year history with the Jacksonville Aviation Authority that has blossomed into a dynamic partnership.

“This is an exciting project for Jacksonville and our team is honored to be their construction partner in delivering Concourse B to help meet the airport’s unprecedented growth in passenger traffic.”

With over $2.75 billion in U.S (c. £2.18 billion). aviation industry experience, Balfour Beatty has significant expertise in the development of airports nationwide, including its highly-experienced aviation team in Jacksonville, Fla. From terminal buildings, baggage handling systems, concessions and parking structures, Balfour Beatty is specialized in building landside and airside facilities that safely transport thousands of people to their destinations every day. Balfour Beatty’s U.S. aviation experience also includes projects delivered for Dallas Fort Worth International Airport, Washington Dulles International Airport, Los Angeles International Airport, Raleigh-Durham International Airport, Miami International Airport, among others.  

The project’s preconstruction phase is scheduled to begin in July 2019 with construction commencing in the summer of 2020 and completion scheduled in December 2022.          

ENDS

Media enquiries to:
Matt Averitt

Balfour Beatty
+1 214 451 1030
maveritt@balfourbeattyus.com

www.balfourbeatty.com | follow us @balfourbeatty

 All non-media related enquiries should be directed to +44 (0)20 7216 6800 or info@balfourbeatty.com

 Notes to editors:

  • Balfour Beatty (www.balfourbeatty.com) is a leading international infrastructure group. With 26,000 employees, we provide innovative and efficient infrastructure that underpins our daily lives, supports communities and enables economic growth. We finance, develop, build and maintain complex infrastructure such as transportation, power and utility systems, social and commercial buildings.
  • Our main geographies are the UK, US and Hong Kong. Over the last 100 years we have created iconic buildings and infrastructure all over the world including the London Olympics’ Aquatic Centre, Hong Kong’s first Zero Carbon building, the National Museum of the Marine Corps in the US and the Channel Tunnel Rail Link.
  • Balfour Beatty is an industry-leading provider of general contracting, at-risk construction management and design-build services for public and private sector clients across the United States. Performing heavy civil and vertical construction, the company is part of Balfour Beatty plc (LSE: BBY), a leading international infrastructure group that provides innovative and efficient infrastructure that underpins our daily lives, supports communities and enables economic growth. Consistently ranked among the nation’s largest contractors, Balfour Beatty is the No. 6 Domestic Building Contractor in the United States as ranked by Engineering News-Record. To learn more, visit www.balfourbeattyus.com.
Avatar for Media Team

Media Team

+44 (0)203 810 2345